Installing a temp 8" PVC waste line and 21 drains to carry slurry away from a demolition site deep underground in Manhattan inside the former Hotel Pennsylvania. We started 3 floors underground and found the main house trap and proceeded to pipe the trunk lines from there picking up the drains as we went.