Driveway to the crawl space is finished. Hauled in the last of the 3" base rock to cover the rip rap. We used a total of 30 loads of rock 14 loads of rip rap and 16 loads of 3" base. I will top coat it with 1" base rock when the house is finished. They shouldn't have any problem getting the concrete and lumber trucks in here now. More to come from this site soon. Thanks for watching! #EliteEarthworks #Takeuchi #Driveway