15 Free YouTube subscribers for your channel
Get Free YouTube Subscribers, Views and Likes

Thermal Power Plant: Steam Turbine Dismantle to Maintenance Repair u0026 Overhaul

Follow
VN Craft Toys

After a 5year operating cycle, the 600mw steam turbine is overhauled once. We record the disassembly process as a document to learn and research, invite you to follow!
This is a steam turbine of a coalfired power plant with a capacity of 600MW, the disassembly process includes the following basic steps:
North of scaffolding around turbine
Remove the link bolt
Using a 100 ton crane to dismantle details such as the main steam manifold, turbine protection cover, turbine housing, impeller blades, static blades, lift off the turbine shaft.
After removing the components for inspection, PT finds cracks, uses sand to clean the surface of the details, replaces damaged parts.
_ After the maintenance process, install the turbine back to the way it was before
Thank you for being here! You are one of the few people who actually read my video description, so thank you!

Popular Videos:
How tomake Claw Machine:    • DIY Hydraulic Powered Claw Machine fr...  
How to make Pinball machine:    • How to make a Pinball Machine – DIY C...  
How to make Samsung Galaxy S20:    • HOW TO MAKE SAMSUNG GALAXY S20 ULTRA ...  
How to make Samsung galaxy Zflip:    • HOW TO MAKE SAMSUNG GALAXY ZFLIP FROM...  
How to make Samsung Galaxy Fold:    • Sensational! SAMSUNG GALAXY FOLD DIY ...  
How to make iPhone 12:    • HOW TO MAKE IPHONE 12  IPHONE 12 PRO...  

So like, comment and subscribe to my channel for more videos:    / @vncrafttoys  
Connect with me on Facebook: https://www.facebook.com/pg/vncraftoy...
Let me know what you think in the comments section below! Thank you!
#vncrafttoys

posted by udorinamr3