The preparatory steps to make a steep slope gradual. Excavate the concrete and bury drainage pipes.

Follow
MK Project 【Japanese civil engineering】

Certainly! Here's the English translation of the video content:

0:00 Overview
In this section, the overview of this project is introduced.

00:53 Concrete Pavement Demolition
Here, the concrete pavement demolition work is being carried out.

01:52 Concrete Debris Removal
The removal of concrete debris is showcased.

02:36 Roadbed Preparation
The stage of preparing the roadbed is shown.

03:57 Discovery of Existing Drainage
The moment when existing drainage is discovered is captured.

04:27 Water Replacement Work
The progress of water replacement work is depicted.

05:07 Drainage Ditch Removal
The removal of drainage ditches is introduced.

06:46 Preparation of Drainage Pipes
Preparation work for drainage pipes is underway.

07:42 Placement of Drainage Pipes
The placement of drainage pipes is showcased.

08:26 Completion of Drainage Pipe Placement
The placement of drainage pipes has been completed.

08:52 Formwork Assembly
The assembly of formwork is in progress.

11:45 Concrete Pouring
Concrete pouring work is being carried out.

13:04 Formwork Demolition
The demolition of formwork is shown.

13:27 Completion of Drainage Pipe Work
The drainage pipe work has been completed.

13:51 Retaining Wall Removal
The removal of retaining walls is in progress.

14:36 Gravel Bedding
Gravel bedding work is being done (Roadbed Preparation).

15:29 Completion
The project is completed.