It was never so easy to get YouTube subscribers
Get Free YouTube Subscribers, Views and Likes

More road closures begin in Downtown Detroit for NFL Draft

Follow
WXYZ-TV Detroit | Channel 7

The second phase of road closures for the 2024 NFL Draft in Downtown Detroit will begin on Monday, April 8. The road closures are part of the bigger draft footprint that will span from Campus Martius to Hart Plaza for both the actual NFL draft stage and the NFL Fan Experience. The newest road closures will last from Monday, April 8 at 9 a.m. until May 5 at 11:59 p.m. and will encompass the roads around Campus Martius Park and the south side of the NFL Draft Theater where the Monroe Street Midway was

posted by Kovorjarq