This video shows the full construction of a Warm Deck Flat Roof from Start to Finish. The rood is a 6 metre long extension roof and had the construction had the added complication of having to join onto an old 3 metre extension roof.
This construction includes:
INSTALLATION OF A STEEL BEAM
INSTALLATION OF THE TIMBER RAFTERS
CONSTRUCTION OF THE ROOFLIGHT
CONSTRUCTION OF THE WARM DECK ROOF
ROOF INSULATION INSTALLATION
COMPLETION OF THE ROOF STRUCTURE
WATERPROOFING OF THE ROOF
TORCH ON FELT APPLICATION
COMPLETION OF THE UPSTANDS FOR THE ROOFLIGHT
TIME LAPSE VIDEO OF FELT INSTALLATION