In our first installment of on the job training Chris shows us his preferred method for building and labeling a small bundle of 20 cables.
Proper bundling creates easy pulling cat6 and network drops that aren't damaged by too much pressure on the pull.
proper labeling eliminates mistakes on all fronts. From missed drops to wrong drops labels matter.