Time lapse of the work and walk through of my UK home renovation this week, which included the groundworks, steelwork installation and foundations being poured.
Instagram for daily updates / 1936_bungalow_renovation
If you like my content, I’d very much appreciate a donation of a coffee https://www.buymeacoffee.com/nicksren...
Episode 1 Before • 1936 Bungalow Renovation with Jungle ...
Episode 2 Strip Out • 1936 Bungalow Renovation UK House S...
Episode 3 Planning Permission Accepted • 1936 Bungalow Renovation UK Plannin...
Episode 4 Structural Work Begins • 1936 Bungalow Renovation UK No long...
Episode 5 Foundations • 1936 Bungalow Renovation UK Groundw...
Really happy with how this has progressed, especially in what was an awful week weather wise and not ideal for this type of work. The builders have managed to
Remove an exterior wall
Install steelwork to exterior wall to eventually extend into old garage space
Dig the 1.4m foundations
Dig the 2 square metre soakaway
Dig up the patio area
Level out 90% of the garden
Remove several internal walls
Remove lots and lots of soil!
IMPORTANT TIMINGS IN THIS VIDEO
0 to 9 minutes Walkthrough
9 minutes Exterior side wall removal for steelwork
9 minutes 35 seconds Clearing the garden for extension and groundwork
11 minutes 30 seconds Foundation digging
13 minutes 30 seconds Close up of the wet weather
13 minutes 50 seconds Shuttering installation to stop the sides caving in / groundwork
19 minutes Concrete pour
19 minutes 44 to end Levelling garden
THANK YOU FOR WATCHING, SUBSCRIBING AND YOUR LOVELY COMMENTS